
Today’s pour from our Olaya barista ☕ Can you guess the shape?
Posted 19 September 2026 at 2 pm · 59d ago
Reach
912
usually 702
Impressions
1,227
Engagement rate
6.4%
usually 5%
New followers
10
11.0 per 1,000 reached
Likes
45
Comments
5
Shares
5
Saves
3
Cumulative reach hour by hour, against your typical Facebook post
63% of the reach came from outside your followers.
Brought 10 new followers — 11.0 per 1,000 reached (usually 6.9).
A typical performance on Facebook: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 2 of 5 are positive, and 1 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«That pour is stunning 😍 who’s the barista?»Ghada Al-Rasheed
«How much is a kilo of the Ethiopian beans?»Ghada Al-Rasheed
Latest 5 of 5
Comment mood
Nice 👍
The croissant was cold last time — please keep an eye on it
That pour is stunning 😍 who’s the barista?
How much is a kilo of the Ethiopian beans?
The Hittin seating is honestly the best place to study