
A day in the life of a barista: opening to last order
Posted 19 September 2026 at 2 pm · 59d ago
65% of the reach came from outside your followers.
Brought 140 new followers — 12.1 per 1,000 reached (usually 6.4).
Reach
11,544
usually 8,880
Impressions
16,837
Engagement rate
6.7%
usually 5.4%
New followers
140
12.1 per 1,000 reached
Likes
557
Comments
52
Shares
79
Saves
80
Cumulative reach hour by hour, against your typical Instagram post
Average watch 14s of 37s — 38% of the video
65% of the reach came from outside your followers.
Brought 140 new followers — 12.1 per 1,000 reached (usually 6.4).
A typical performance on Instagram: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 0 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Abdullah Al-Shammari
«When exactly does the Al-Malqa branch open?»Arwa Al-Zahrani
Latest 6 of 52
Comment mood
Nice 👍
How much is a kilo of the Ethiopian beans?
Tagging @lama_n — we have to go this weekend
When exactly does the Al-Malqa branch open?
The croissant was cold last time — please keep an eye on it
Prices have crept up compared with last year