
Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Posted 19 September 2026 at 2 pm · 59d ago
Reach
2,171
usually 639
Impressions
3,459
Engagement rate
8.4%
usually 4.8%
New followers
24
11.1 per 1,000 reached
Likes
139
Comments
15
Shares
16
Saves
12
Cumulative reach hour by hour, against your typical X post
77% of the reach came from outside your followers.
Brought 24 new followers — 11.1 per 1,000 reached (usually 6.9).
It worked because it came as a Image — the format your X audience engages with most — so it beat your usual 3.4× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Bandar Al-Ghamdi
«The Hittin seating is honestly the best place to study»Joud Al-Qurashi
Latest 6 of 15
Comment mood
Nice 👍
How much is a kilo of the Ethiopian beans?
The Hittin seating is honestly the best place to study
Tried it today — balanced and not too sweet 👌
Tagging @lama_n — we have to go this weekend
Do you have almond milk instead of oat?