
Step by step: our V60 with Ethiopian Yirgacheffe
Posted 31 August 2026 at 2 pm · 78d ago
74% of the reach came from outside your followers.
Brought 7 new followers — 7.0 per 1,000 reached (usually 6.9).
Reach
1,003
usually 627
Impressions
1,617
Engagement rate
6.5%
usually 4.8%
New followers
7
7.0 per 1,000 reached
Likes
50
Comments
5
Shares
7
Saves
3
Cumulative reach hour by hour, against your typical X post
Average watch 14s of 34s — 41% of the video
74% of the reach came from outside your followers.
Brought 7 new followers — 7.0 per 1,000 reached (usually 6.9).
It worked because it came as a Video — the format your X audience engages with most — so it beat your usual 1.6× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 2 of 5 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«The Hittin seating is honestly the best place to study»Yousef Al-Khalidi
«How much is a kilo of the Ethiopian beans?»Sama Cooks
Latest 5 of 5
Comment mood
The Hittin seating is honestly the best place to study
Nice 👍
How much is a kilo of the Ethiopian beans?
Best cheesecake I’ve had this month, worth every riyal
When exactly does the Al-Malqa branch open?