
Ask us: what’s the difference between a flat white and a cortado?
Posted 31 August 2026 at 11 am · 79d ago
79% of the reach came from outside your followers.
Brought 144 new followers — 6.5 per 1,000 reached (usually 6.4).
Reach
22,188
usually 8,875
Impressions
40,885
Engagement rate
4.9%
usually 5.4%
New followers
144
6.5 per 1,000 reached
Likes
776
Comments
84
Shares
124
Saves
93
Cumulative reach hour by hour, against your typical Instagram post
Average watch 20s of 46s — 43% of the video
79% of the reach came from outside your followers.
Brought 144 new followers — 6.5 per 1,000 reached (usually 6.4).
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 2.5× and most of it reached people who don’t follow you yet.
It went out at 11 am while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«Do you have almond milk instead of oat?»Ziyad Al-Fifi
«How much is a kilo of the Ethiopian beans?»Abdullah Al-Shammari
Latest 6 of 84
Comment mood
Prices have crept up compared with last year
Do you have almond milk instead of oat?
How much is a kilo of the Ethiopian beans?
The Hittin seating is honestly the best place to study
That pour is stunning 😍 who’s the barista?
Nice 👍