
A day in the life of a barista: opening to last order
Posted 11 September 2026 at 10 pm · 67d ago
89% of the reach came from outside your followers.
Brought 65 new followers — 15.1 per 1,000 reached (usually 6.9).
Reach
4,310
usually 643
Impressions
6,649
Engagement rate
4.4%
usually 4.8%
New followers
65
15.1 per 1,000 reached
Likes
149
Comments
18
Shares
22
Saves
2
Cumulative reach hour by hour, against your typical X post
Average watch 14s of 26s — 54% of the video
89% of the reach came from outside your followers.
Brought 65 new followers — 15.1 per 1,000 reached (usually 6.9).
It worked because it came as a Video — the format your X audience engages with most — so it beat your usual 6.7× and most of it reached people who don’t follow you yet.
It went out while your audience was active, so the first engagements came fast and the platform pushed it to non-followers.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea as a Video this week, and pin a comment answering the most-asked question.
Evidence
«The Hittin seating is honestly the best place to study»Maryam Al-Ansari
«That pour is stunning 😍 who’s the barista?»Bandar Al-Ghamdi
Latest 6 of 18
Comment mood
The Hittin seating is honestly the best place to study
That pour is stunning 😍 who’s the barista?
When exactly does the Al-Malqa branch open?
Tagging @lama_n — we have to go this weekend
Nice 👍
Do you have almond milk instead of oat?