
Step by step: our V60 with Ethiopian Yirgacheffe
Posted 11 September 2026 at 2 pm · 68d ago
60% of the reach came from outside your followers.
Brought 64 new followers — 7.3 per 1,000 reached (usually 6.4).
Reach
8,770
usually 8,770
Impressions
15,955
Engagement rate
5.8%
usually 5.4%
New followers
64
7.3 per 1,000 reached
Likes
391
Comments
32
Shares
52
Saves
31
Cumulative reach hour by hour, against your typical Instagram post
Average watch 23s of 51s — 45% of the video
60% of the reach came from outside your followers.
Brought 64 new followers — 7.3 per 1,000 reached (usually 6.4).
A typical performance on Instagram: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 9 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 9 pm, at your audience’s peak.
Evidence
«When exactly does the Al-Malqa branch open?»Rima Al-Balawi
«That pour is stunning 😍 who’s the barista?»Nadine Reviews
Latest 6 of 32
Comment mood
When exactly does the Al-Malqa branch open?
That pour is stunning 😍 who’s the barista?
Prices have crept up compared with last year
How much is a kilo of the Ethiopian beans?
Ordered on the app yesterday and it took a full hour… Narjis branch
The Hittin seating is honestly the best place to study