
Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Posted 6 September 2026 at 10 pm · 72d ago
81% of the reach came from outside your followers.
Brought 774 new followers — 14.9 per 1,000 reached (usually 6.9).
Reach
51,960
usually 14.4K
Impressions
67,807
Engagement rate
4.8%
usually 4.3%
New followers
774
14.9 per 1,000 reached
Likes
1,910
Comments
156
Shares
223
Saves
212
Cumulative reach hour by hour, against your typical TikTok post
Average watch 16s of 40s — 40% of the video
81% of the reach came from outside your followers.
Brought 774 new followers — 14.9 per 1,000 reached (usually 6.9).
It worked because it came as a Video — the format your TikTok audience engages with most — so it beat your usual 3.6× and most of it reached people who don’t follow you yet.
It went out while your audience was active, so the first engagements came fast and the platform pushed it to non-followers.
The comments back this up: 2 of 6 are positive, and 3 ask about the details — a sign of real interest.
Next step: repeat the idea as a Video this week, and pin a comment answering the most-asked question.
Evidence
«When exactly does the Al-Malqa branch open?»Arwa Al-Zahrani
«How much is a kilo of the Ethiopian beans?»Alanoud Al-Sudairi
Latest 6 of 156
Comment mood
When exactly does the Al-Malqa branch open?
How much is a kilo of the Ethiopian beans?
Tagging @lama_n — we have to go this weekend
Tried it today — balanced and not too sweet 👌
The Hittin seating is honestly the best place to study
Do you have almond milk instead of oat?