
Today’s pour from our Olaya barista ☕ Can you guess the shape?
Posted 8 September 2026 at 2 pm · 70d ago
69% of the reach came from outside your followers.
Brought 124 new followers — 8.7 per 1,000 reached (usually 6.4).
Reach
14,265
usually 8,916
Impressions
26,072
Engagement rate
7%
usually 5.4%
New followers
124
8.7 per 1,000 reached
Likes
794
Comments
62
Shares
113
Saves
29
Cumulative reach hour by hour, against your typical Instagram post
Average watch 29s of 52s — 56% of the video
69% of the reach came from outside your followers.
Brought 124 new followers — 8.7 per 1,000 reached (usually 6.4).
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 1.6× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 9 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 9 pm, at your audience’s peak.
Evidence
«Do you have almond milk instead of oat?»Dalal Al-Hajri
«The Hittin seating is honestly the best place to study»Bandar Al-Ghamdi
Latest 6 of 62
Comment mood
Tagging @lama_n — we have to go this weekend
Prices have crept up compared with last year
Do you have almond milk instead of oat?
The Hittin seating is honestly the best place to study
When exactly does the Al-Malqa branch open?
Tried it today — balanced and not too sweet 👌