
Step by step: our V60 with Ethiopian Yirgacheffe
Posted 21 September 2026 at 2 pm · 57d ago
67% of the reach came from outside your followers.
Brought 196 new followers — 10.4 per 1,000 reached (usually 6.9).
Reach
18,898
usually 14.5K
Impressions
27,711
Engagement rate
4.2%
usually 4.3%
New followers
196
10.4 per 1,000 reached
Likes
570
Comments
74
Shares
65
Saves
81
Cumulative reach hour by hour, against your typical TikTok post
Average watch 18s of 37s — 49% of the video
67% of the reach came from outside your followers.
Brought 196 new followers — 10.4 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 9 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 9 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Joud Al-Qurashi
«Do you have almond milk instead of oat?»Riyadh Eats Guide
Latest 6 of 74
Comment mood
How much is a kilo of the Ethiopian beans?
Do you have almond milk instead of oat?
Nice 👍
The Hittin seating is honestly the best place to study
Honestly the best coffee in Riyadh — I stop by every morning before work
Why no reply on WhatsApp? I messaged this morning