
Za’atar & cheese croissant is back — every branch from 7 am
Posted 21 September 2026 at 2 pm · 58d ago
Reach
5,447
usually 9,078
Impressions
9,085
Engagement rate
6.6%
usually 5.4%
New followers
32
5.9 per 1,000 reached
Likes
267
Comments
32
Shares
28
Saves
32
Cumulative reach hour by hour, against your typical Instagram post
49% of the reach came from outside your followers.
Brought 32 new followers — 5.9 per 1,000 reached (usually 6.4).
It fell short: it reached 60% of your usual, and Image isn’t your strongest format on Instagram.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
Those who saw it liked it: 3 of 6 comments are positive — the problem was reach, not the content.
Next step: redo the idea as a Reel and post it at 10 pm.
Evidence
«The croissant was cold last time — please keep an eye on it»Faisal Al-Qahtani
Latest 6 of 32
Comment mood
Tried it today — balanced and not too sweet 👌
Best cheesecake I’ve had this month, worth every riyal
The Hittin seating is honestly the best place to study
The croissant was cold last time — please keep an eye on it
How much is a kilo of the Ethiopian beans?
Nice 👍