
Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Posted 24 September 2026 at 2 pm · 54d ago
Reach
11,464
usually 8,818
Impressions
15,724
Engagement rate
9.2%
usually 5.4%
New followers
103
9.0 per 1,000 reached
Likes
802
Comments
104
Shares
75
Saves
78
Cumulative reach hour by hour, against your typical Instagram post
59% of the reach came from outside your followers.
Brought 103 new followers — 9.0 per 1,000 reached (usually 6.4).
A typical performance on Instagram: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 11 pm; at the peak it would have started stronger.
The comments back this up: 1 of 6 are positive, and 3 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 11 pm, at your audience’s peak.
Evidence
«That pour is stunning 😍 who’s the barista?»Riyadh Eats Guide
«When exactly does the Al-Malqa branch open?»Joud Al-Qurashi
Latest 6 of 104
Comment mood
The croissant was cold last time — please keep an eye on it
That pour is stunning 😍 who’s the barista?
When exactly does the Al-Malqa branch open?
Do you have almond milk instead of oat?
How much is a kilo of the Ethiopian beans?
Why no reply on WhatsApp? I messaged this morning