
Step by step: our V60 with Ethiopian Yirgacheffe
Posted 24 September 2026 at 2 pm · 54d ago
59% of the reach came from outside your followers.
Brought 16 new followers — 18.0 per 1,000 reached (usually 6.9).
Reach
888
usually 740
Impressions
1,290
Engagement rate
6.8%
usually 5%
New followers
16
18.0 per 1,000 reached
Likes
45
Comments
5
Shares
5
Saves
5
Cumulative reach hour by hour, against your typical Facebook post
Average watch 11s of 28s — 39% of the video
59% of the reach came from outside your followers.
Brought 16 new followers — 18.0 per 1,000 reached (usually 6.9).
A typical performance on Facebook: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 1 of 5 are positive, and 3 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Nouf Al-Juhani
«That pour is stunning 😍 who’s the barista?»Sama Cooks
Latest 5 of 5
Comment mood
Nice 👍
How much is a kilo of the Ethiopian beans?
That pour is stunning 😍 who’s the barista?
When exactly does the Al-Malqa branch open?
Do you have almond milk instead of oat?