
Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Reel · 9 November 2026
28.9K reach12% eng.3.3× usual
Bayt Al-Bunn
Weekly performance report
Compared with 1 – 7 November 2026
Reach
229.8K
+100%
Engagement rate
6.4%
+35%
Net growth
+1,530
+2%
Avg. response
1h 20m
+18%
What mattered this period
Your posts reached 229.8K people, 100% more than the previous period.
You gained 1,530 net followers (2,489 new against 959 who left).
Top post: “Our sixth branch opens in Al-Malqa — first 100 visitors drink free” on Instagram — 3.3× your usual.
Average reply to messages and comments was 1h 20m, and 14% went unanswered.
Instagram brought the highest engagement of your platforms (8.2%).
A good period for content and a hard one for customer care. Reach reached 229.8K with a 6.4% engagement rate, and short video on TikTok and Instagram drove most of the growth. Complaints, though, centred on late delivery orders from the Narjis branch — 40% of all negative comments on their own. The audience engages between 9 and 11 pm, while most posts still go out at 2 pm.
Based on 1,087 comments and messages
«Ordered from the Narjis branch, it took an hour and a quarter and the coffee was cold 😞»
«Your V60 is the best I’ve had in Riyadh, well done»

Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Went out while the audience was active, as a Reel.
28.9K reach12% eng.3.3× usual
Each figure with its change from 1 – 7 November 2026
Followers
101.6K
+2%vs previous period
Net growth
+1,530
Reach
229.8K
+100%Engagements
14.8K
+171%Engagement rate
6.4%
+35%vs previous period
Posts
17
+21%vs previous period
Profile visits
7,012
+97%vs previous period
Avg. response
1h 20m
+18%vs previous period
People who saw your posts each day
Each day of the period
Where the real engagement comes from, and which formats work
| Platform | Followers | Reach | Engagement | Rate | Posts |
|---|---|---|---|---|---|
| 48.6K | 107.2K +132% | 8,818 | 8.2% | 6 | |
| TikTok | 31.2K | 102K +232% | 5,376 | 5.3% | 3 |
| X | 9,410 | 3,118 +19% | 149 | 4.8% | 5 |
| 12.9K | 2,440 +84% | 104 | 4.3% | 3 |
14.4K
engagements
Per post, this period
What worked and why, and what didn’t land

Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Reel · 9 November 2026
28.9K reach12% eng.3.3× usual

Saudi coffee done right, with Qassim Sukkari dates 🌴
Reel · 13 November 2026
33.1K reach8.8% eng.3.8× usual

Saudi coffee done right, with Qassim Sukkari dates 🌴
Video · 13 November 2026
61.2K reach5.4% eng.4.2× usual
Ask us: what’s the difference between a flat white and a cortado?
X · Text · 2 pm
320 reach5.3% eng.0.5× usual

Farm to cup: the Colombian harvest has landed, roasting Thursday
X · Video · 2 pm
414 reach3.1% eng.0.6× usual

Quick poll: paper cup or reusable cup?
Instagram · Story · 9 pm
4,950 reach4.5% eng.0.6× usual
When your audience engages, and how long they wait for a reply
Darker = more engagement. Dot = you posted at that hour.
Peak: Thursday at 10 pm
193 chats and comments
Average
1h 20m+18%
Median
50m
Worst case
10h
Unanswered
14%
Per person
Per channel
Target: under an hour
How people feel, and what they talk about
1,087 comments and mentions analysed
Negative«Ordered from the Narjis branch, it took an hour and a quarter and the coffee was cold 😞»
Positive«Your V60 is the best I’ve had in Riyadh, well done»
Neutral«When is the date latte back? We’ve waited since last winter»
Concrete steps for the next period, each with the number it is based on
The negative comments about delays repeat the same point. One clarifying post with a fix date and a small make-good will stop the wave faster than replying to each comment.
Based on 225 comments and messages
Move your posting time to the evening
Your audience is most active between 9 pm and 11 pm, while 65% of your posts went out at 2 pm.
Based on: Activity map + your posting times
Post more Reel
Reel reaches 8.4× more than Image, yet you posted only 11 against 24.
Based on: Average reach per format
Back Majed Al-Dosari up on replies
Majed Al-Dosari averages 2h 25m against 1h 20m for the team. Spread that shift’s messages or add an auto-reply for the common questions.
Based on: First-reply time per conversation
Focus effort on Instagram
Engagement on Instagram is 8.2% against 4.3% on Facebook for the same effort.
Based on: Engagement ÷ reach per platform
The report holds no private-message text; messages are counted and classified only.
End of report