
Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Video · 13 October 2026
47.8K reach5.4% eng.3.3× usual
Bayt Al-Bunn
Weekly performance report
Compared with 4 – 10 October 2026
Reach
171.4K
+1%
Engagement rate
4.8%
+17%
Net growth
+1,611
+2%
Avg. response
49m
+18%
What mattered this period
Your posts reached 171.4K people, 1% more than the previous period.
You gained 1,611 net followers (1,939 new against 328 who left).
Top post: “Our sixth branch opens in Al-Malqa — first 100 visitors drink free” on TikTok — 3.3× your usual.
Average reply to messages and comments was 49m, and 14% went unanswered.
Facebook brought the highest engagement of your platforms (5.9%).
A good period for content and a hard one for customer care. Reach reached 171.4K with a 4.8% engagement rate, and short video on TikTok and Instagram drove most of the growth. Complaints, though, centred on late delivery orders from the Narjis branch — 40% of all negative comments on their own. The audience engages between 9 and 11 pm, while most posts still go out at 2 pm.
Based on 691 comments and messages
«Ordered from the Narjis branch, it took an hour and a quarter and the coffee was cold 😞»
«Your V60 is the best I’ve had in Riyadh, well done»

Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Went out while the audience was active, as a Video.
47.8K reach5.4% eng.3.3× usual
Each figure with its change from 4 – 10 October 2026
Followers
95.3K
+2%vs previous period
Net growth
+1,611
Reach
171.4K
+1%Engagements
8,175
+18%Engagement rate
4.8%
+17%vs previous period
Posts
15
−6%vs previous period
Profile visits
5,125
−5%vs previous period
Avg. response
49m
+18%vs previous period
People who saw your posts each day
Each day of the period
Where the real engagement comes from, and which formats work
| Platform | Followers | Reach | Engagement | Rate | Posts |
|---|---|---|---|---|---|
| 48.6K | 85.8K +3% | 4,645 | 5.4% | 5 | |
| TikTok | 31.2K | 72.2K +50% | 3,672 | 5.1% | 3 |
| X | 9,410 | 4,201 −20% | 238 | 5.7% | 5 |
| 12.9K | 957 −76% | 56 | 5.9% | 2 |
8,611
engagements
Per post, this period
What worked and why, and what didn’t land

Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Video · 13 October 2026
47.8K reach5.4% eng.3.3× usual

Our sixth branch opens in Al-Malqa — first 100 visitors drink free
Reel · 17 October 2026
40.4K reach5.5% eng.4.6× usual

Ask us: what’s the difference between a flat white and a cortado?
Reel · 14 October 2026
12.1K reach6.6% eng.1.4× usual

Farm to cup: the Colombian harvest has landed, roasting Thursday
TikTok · Video · 2 pm
8,588 reach3.6% eng.0.6× usual

Winter seating is ready at Hittin 🔥 come warm up
Facebook · Carousel · 2 pm
425 reach4% eng.0.6× usual

Za’atar & cheese croissant is back — every branch from 7 am
X · Image · 5 pm
367 reach3% eng.0.6× usual
When your audience engages, and how long they wait for a reply
Darker = more engagement. Dot = you posted at that hour.
Peak: Thursday at 10 pm
232 chats and comments
Average
49m+18%
Median
30m
Worst case
6h 8m
Unanswered
14%
Per person
Per channel
Target: under an hour
How people feel, and what they talk about
691 comments and mentions analysed
Negative«Ordered from the Narjis branch, it took an hour and a quarter and the coffee was cold 😞»
Positive«Your V60 is the best I’ve had in Riyadh, well done»
Neutral«When is the date latte back? We’ve waited since last winter»
Concrete steps for the next period, each with the number it is based on
The negative comments about delays repeat the same point. One clarifying post with a fix date and a small make-good will stop the wave faster than replying to each comment.
Based on 112 comments and messages
Move your posting time to the evening
Your audience is most active between 9 pm and 11 pm, while 67% of your posts went out at 2 pm.
Based on: Activity map + your posting times
Post more Reel
Reel reaches 4.5× more than Image, yet you posted only 7 against 28.
Based on: Average reach per format
Back Majed Al-Dosari up on replies
Majed Al-Dosari averages 2h 5m against 49m for the team. Spread that shift’s messages or add an auto-reply for the common questions.
Based on: First-reply time per conversation
Focus effort on Facebook
Engagement on Facebook is 5.9% against 5.1% on TikTok for the same effort.
Based on: Engagement ÷ reach per platform
The report holds no private-message text; messages are counted and classified only.
End of report