Colours
Every colour on screen is one of these names, never a hand-typed code. Click a colour to copy its name.
tokens · ColorSwatchTwo colours make a project its own: the brand and the accent, plus the ink. The three are written in ONE block at the top of the stylesheet, and everything shown here is derived from them — light and dark alike. Change that block and every screen changes.
Brand
Accent
Ink steps
Surfaces
Lines
The four status tones
| Tone | Soft | Solid | When |
|---|---|---|---|
Brandbrand | Sample | Sample | The main action, links, selection |
Neutralneutral | Sample | Sample | Drafts, secondary actions |
Accentaccent | Sample | Sample | What deserves a gentle look |
Successsuccess | Sample | Sample | Approved, complete, on time |
Warningwarning | Sample | Sample | Close to due, needs a change |
Dangerdanger | Sample | Sample | Late, delete, reject |
Infoinfo | Sample | Sample | In review, a note |
Status tones are fixed: they never follow a rebrand, so red is red in every project.
Gradient and the deep shade
Signature gradient
For the ONE key action on a screen
bg-signatureGlow
For a page hero or an empty state
bg-glowDeep shade
The sidebar and tooltips
bg-deep