
Za’atar & cheese croissant is back — every branch from 7 am
Posted 8 November 2026 at 9 am · 10d ago
Reach
642
usually 642
Impressions
953
Engagement rate
6.2%
usually 4.8%
New followers
3
4.7 per 1,000 reached
Likes
29
Comments
4
Shares
4
Saves
3
Cumulative reach hour by hour, against your typical X post
57% of the reach came from outside your followers.
Brought 3 new followers — 4.7 per 1,000 reached (usually 6.9).
A typical performance on X: nothing wrong, and nothing striking enough to travel.
It went out at 9 am while your audience peaks at 11 pm; at the peak it would have started stronger.
The comments back this up: 0 of 4 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 11 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Dalal Al-Hajri
«Do you have almond milk instead of oat?»Mishal Al-Dosari
Latest 4 of 4
Comment mood
The croissant was cold last time — please keep an eye on it
How much is a kilo of the Ethiopian beans?
Tagging @lama_n — we have to go this weekend
Do you have almond milk instead of oat?