
A day in the life of a barista: opening to last order
Posted 9 October 2026 at 9 pm · 39d ago
85% of the reach came from outside your followers.
Brought 24 new followers — 6.9 per 1,000 reached (usually 6.9).
Reach
3,499
usually 648
Impressions
5,595
Engagement rate
6.7%
usually 4.8%
New followers
24
6.9 per 1,000 reached
Likes
176
Comments
19
Shares
17
Saves
22
Cumulative reach hour by hour, against your typical X post
Average watch 15s of 35s — 43% of the video
85% of the reach came from outside your followers.
Brought 24 new followers — 6.9 per 1,000 reached (usually 6.9).
It worked because it came as a Video — the format your X audience engages with most — so it beat your usual 5.4× and most of it reached people who don’t follow you yet.
It went out at 9 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 3 of 6 are positive, and 3 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«Do you have almond milk instead of oat?»Nayef Al-Malki
«When exactly does the Al-Malqa branch open?»Sama Cooks
Latest 6 of 19
Comment mood
Do you have almond milk instead of oat?
When exactly does the Al-Malqa branch open?
That pour is stunning 😍 who’s the barista?
The Hittin seating is honestly the best place to study
How much is a kilo of the Ethiopian beans?
Honestly the best coffee in Riyadh — I stop by every morning before work