
Step by step: our V60 with Ethiopian Yirgacheffe
Posted 26 October 2026 at 11 am · 23d ago
68% of the reach came from outside your followers.
Brought 12 new followers — 11.6 per 1,000 reached (usually 6.9).
Reach
1,031
usually 644
Impressions
1,387
Engagement rate
6.3%
usually 4.8%
New followers
12
11.6 per 1,000 reached
Likes
48
Comments
5
Shares
7
Saves
5
Cumulative reach hour by hour, against your typical X post
Average watch 28s of 51s — 55% of the video
68% of the reach came from outside your followers.
Brought 12 new followers — 11.6 per 1,000 reached (usually 6.9).
It worked because it came as a Video — the format your X audience engages with most — so it beat your usual 1.6× and most of it reached people who don’t follow you yet.
It went out at 11 am while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 3 of 5 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«The Hittin seating is honestly the best place to study»Bandar Al-Ghamdi
«How much is a kilo of the Ethiopian beans?»Dalal Al-Hajri
Latest 5 of 5
Comment mood
The Hittin seating is honestly the best place to study
How much is a kilo of the Ethiopian beans?
Tried it today — balanced and not too sweet 👌
Best cheesecake I’ve had this month, worth every riyal
Do you have almond milk instead of oat?