
Belgian chocolate cookies, fresh out of the oven 🍪
Posted 8 November 2026 at 8 pm · 9d ago
58% of the reach came from outside your followers.
Brought 95 new followers — 5.2 per 1,000 reached (usually 6.9).
Reach
18,225
usually 15.2K
Impressions
33,792
Engagement rate
4.8%
usually 4.3%
New followers
95
5.2 per 1,000 reached
Likes
656
Comments
54
Shares
74
Saves
88
Cumulative reach hour by hour, against your typical TikTok post
Average watch 13s of 34s — 38% of the video
58% of the reach came from outside your followers.
Brought 95 new followers — 5.2 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 8 pm while your audience peaks at 11 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 11 pm, at your audience’s peak.
Evidence
«When exactly does the Al-Malqa branch open?»Ziyad Al-Fifi
«That pour is stunning 😍 who’s the barista?»Rima Al-Balawi
Latest 6 of 54
Comment mood
When exactly does the Al-Malqa branch open?
The croissant was cold last time — please keep an eye on it
That pour is stunning 😍 who’s the barista?
The Hittin seating is honestly the best place to study
How much is a kilo of the Ethiopian beans?
Ordered on the app yesterday and it took a full hour… Narjis branch