
Za’atar & cheese croissant is back — every branch from 7 am
Posted 29 August 2026 at 2 pm · 80d ago
54% of the reach came from outside your followers.
Brought 82 new followers — 6.4 per 1,000 reached (usually 6.9).
Reach
12,800
usually 14.2K
Impressions
21,930
Engagement rate
3.9%
usually 4.3%
New followers
82
6.4 per 1,000 reached
Likes
394
Comments
43
Shares
52
Saves
8
Cumulative reach hour by hour, against your typical TikTok post
Average watch 9s of 23s — 39% of the video
54% of the reach came from outside your followers.
Brought 82 new followers — 6.4 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Sultan Al-Enezi
«Honestly the best coffee in Riyadh — I stop by every morning before work»Rima Al-Balawi
Latest 6 of 43
Comment mood
How much is a kilo of the Ethiopian beans?
Tagging @lama_n — we have to go this weekend
Honestly the best coffee in Riyadh — I stop by every morning before work
When exactly does the Al-Malqa branch open?
Prices have crept up compared with last year
Tried it today — balanced and not too sweet 👌