
Iced Spanish latte with oat milk — new on the menu
Posted 23 September 2026 at 2 pm · 55d ago
59% of the reach came from outside your followers.
Brought 39 new followers — 3.4 per 1,000 reached (usually 6.9).
Reach
11,521
usually 14.4K
Impressions
15,967
Engagement rate
4.8%
usually 4.3%
New followers
39
3.4 per 1,000 reached
Likes
431
Comments
44
Shares
65
Saves
12
Cumulative reach hour by hour, against your typical TikTok post
Average watch 6s of 19s — 32% of the video
59% of the reach came from outside your followers.
Brought 39 new followers — 3.4 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 3 of 6 are positive, and 1 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«How much is a kilo of the Ethiopian beans?»Maryam Al-Ansari
«Honestly the best coffee in Riyadh — I stop by every morning before work»Mishal Al-Dosari
Latest 6 of 44
Comment mood
How much is a kilo of the Ethiopian beans?
Tagging @lama_n — we have to go this weekend
Honestly the best coffee in Riyadh — I stop by every morning before work
Prices have crept up compared with last year
The Hittin seating is honestly the best place to study
Best cheesecake I’ve had this month, worth every riyal