
A day in the life of a barista: opening to last order
Posted 4 October 2026 at 2 pm · 45d ago
58% of the reach came from outside your followers.
Brought 161 new followers — 8.4 per 1,000 reached (usually 6.9).
Reach
19,101
usually 14.7K
Impressions
32,710
Engagement rate
6.4%
usually 4.3%
New followers
161
8.4 per 1,000 reached
Likes
919
Comments
83
Shares
106
Saves
123
Cumulative reach hour by hour, against your typical TikTok post
Average watch 23s of 54s — 43% of the video
58% of the reach came from outside your followers.
Brought 161 new followers — 8.4 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 11 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 11 pm, at your audience’s peak.
Evidence
«That pour is stunning 😍 who’s the barista?»Rakan Al-Mutairi
«The Hittin seating is honestly the best place to study»Bandar Al-Ghamdi
Latest 6 of 83
Comment mood
Prices have crept up compared with last year
Ordered on the app yesterday and it took a full hour… Narjis branch
That pour is stunning 😍 who’s the barista?
The Hittin seating is honestly the best place to study
When exactly does the Al-Malqa branch open?
How much is a kilo of the Ethiopian beans?