
Ask us: what’s the difference between a flat white and a cortado?
Posted 8 October 2026 at 2 pm · 41d ago
60% of the reach came from outside your followers.
Brought 166 new followers — 9.3 per 1,000 reached (usually 6.9).
Reach
17,798
usually 14.8K
Impressions
27,187
Engagement rate
4.1%
usually 4.3%
New followers
166
9.3 per 1,000 reached
Likes
546
Comments
61
Shares
83
Saves
40
Cumulative reach hour by hour, against your typical TikTok post
Average watch 10s of 21s — 48% of the video
60% of the reach came from outside your followers.
Brought 166 new followers — 9.3 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«Tried it today — balanced and not too sweet 👌»Rakan Al-Mutairi
«Do you have almond milk instead of oat?»Joud Al-Qurashi
Latest 6 of 61
Comment mood
Nice 👍
Tried it today — balanced and not too sweet 👌
Do you have almond milk instead of oat?
How much is a kilo of the Ethiopian beans?
Prices have crept up compared with last year
The Hittin seating is honestly the best place to study