
Winter seating is ready at Hittin 🔥 come warm up
Posted 12 October 2026 at 2 pm · 37d ago
60% of the reach came from outside your followers.
Brought 64 new followers — 4.0 per 1,000 reached (usually 6.9).
Reach
15,850
usually 14.4K
Impressions
23,929
Engagement rate
5%
usually 4.3%
New followers
64
4.0 per 1,000 reached
Likes
599
Comments
62
Shares
63
Saves
73
Cumulative reach hour by hour, against your typical TikTok post
Average watch 14s of 36s — 39% of the video
60% of the reach came from outside your followers.
Brought 64 new followers — 4.0 per 1,000 reached (usually 6.9).
A typical performance on TikTok: nothing wrong, and nothing striking enough to travel.
It went out at 2 pm while your audience peaks at 9 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 9 pm, at your audience’s peak.
Evidence
«When exactly does the Al-Malqa branch open?»Turki Al-Baqami
«How much is a kilo of the Ethiopian beans?»Bandar Al-Ghamdi
Latest 6 of 62
Comment mood
When exactly does the Al-Malqa branch open?
How much is a kilo of the Ethiopian beans?
Ordered on the app yesterday and it took a full hour… Narjis branch
Honestly the best coffee in Riyadh — I stop by every morning before work
Nice 👍
That pour is stunning 😍 who’s the barista?