
Saffron & cardamom cheesecake… one slice is never enough
Posted 25 August 2026 at 10 pm · 84d ago
88% of the reach came from outside your followers.
Brought 188 new followers — 4.2 per 1,000 reached (usually 6.4).
Reach
44,482
usually 8,722
Impressions
76,182
Engagement rate
8.4%
usually 5.4%
New followers
188
4.2 per 1,000 reached
Likes
2,812
Comments
343
Shares
356
Saves
243
Cumulative reach hour by hour, against your typical Instagram post
Average watch 22s of 45s — 49% of the video
88% of the reach came from outside your followers.
Brought 188 new followers — 4.2 per 1,000 reached (usually 6.4).
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 5.1× and most of it reached people who don’t follow you yet.
It went out while your audience was active, so the first engagements came fast and the platform pushed it to non-followers.
The comments back this up: 3 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea as a Reel this week, and pin a comment answering the most-asked question.
Evidence
«When exactly does the Al-Malqa branch open?»Yousef Al-Khalidi
«The Hittin seating is honestly the best place to study»Maryam Al-Ansari
Latest 6 of 343
Comment mood
When exactly does the Al-Malqa branch open?
The Hittin seating is honestly the best place to study
Honestly the best coffee in Riyadh — I stop by every morning before work
Do you have almond milk instead of oat?
The croissant was cold last time — please keep an eye on it
Best cheesecake I’ve had this month, worth every riyal