
Iced Spanish latte with oat milk — new on the menu
Posted 14 September 2026 at 5 pm · 64d ago
53% of the reach came from outside your followers.
Brought 32 new followers — 5.1 per 1,000 reached (usually 6.4).
Reach
6,282
usually 8,974
Impressions
8,363
Engagement rate
5.2%
usually 5.4%
New followers
32
5.1 per 1,000 reached
Likes
247
Comments
32
Shares
31
Saves
15
Cumulative reach hour by hour, against your typical Instagram post
Average watch 21s of 58s — 36% of the video
53% of the reach came from outside your followers.
Brought 32 new followers — 5.1 per 1,000 reached (usually 6.4).
It fell short: it reached 70% of your usual, and Reel isn’t your strongest format on Instagram.
It went out at 5 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
Those who saw it liked it: 3 of 6 comments are positive — the problem was reach, not the content.
Next step: redo the idea as a Reel and post it at 10 pm.
Evidence
Latest 6 of 32
Comment mood
When exactly does the Al-Malqa branch open?
That pour is stunning 😍 who’s the barista?
Do you have almond milk instead of oat?
The Hittin seating is honestly the best place to study
Nice 👍
Best cheesecake I’ve had this month, worth every riyal