
Saudi coffee done right, with Qassim Sukkari dates 🌴
Posted 13 November 2026 at 2 pm · 4d ago
78% of the reach came from outside your followers.
Brought 505 new followers — 15.2 per 1,000 reached (usually 6.4).
Reach
33,139
usually 8,721
Impressions
60,905
Engagement rate
8.8%
usually 5.4%
New followers
505
15.2 per 1,000 reached
Likes
2,098
Comments
255
Shares
245
Saves
308
Cumulative reach hour by hour, against your typical Instagram post
Average watch 11s of 35s — 31% of the video
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 3.8× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 9 pm; at the peak it would have started stronger.
The comments back this up: 2 of 6 are positive, and 2 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 9 pm, at your audience’s peak.
Evidence
«The Hittin seating is honestly the best place to study»Rima Al-Balawi
«Do you have almond milk instead of oat?»Turki Al-Subaie
Latest 6 of 255
Comment mood
The Hittin seating is honestly the best place to study
Prices have crept up compared with last year
Tagging @lama_n — we have to go this weekend
Do you have almond milk instead of oat?
When exactly does the Al-Malqa branch open?
That pour is stunning 😍 who’s the barista?