
Ask us: what’s the difference between a flat white and a cortado?
Posted 14 October 2026 at 2 pm · 34d ago
63% of the reach came from outside your followers.
Brought 55 new followers — 4.5 per 1,000 reached (usually 6.4).
Reach
12,100
usually 8,643
Impressions
17,383
Engagement rate
6.6%
usually 5.4%
New followers
55
4.5 per 1,000 reached
Likes
574
Comments
48
Shares
77
Saves
98
Cumulative reach hour by hour, against your typical Instagram post
Average watch 23s of 57s — 40% of the video
63% of the reach came from outside your followers.
Brought 55 new followers — 4.5 per 1,000 reached (usually 6.4).
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 1.4× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 1 of 6 are positive, and 3 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«Do you have almond milk instead of oat?»Faisal Al-Qahtani
«When exactly does the Al-Malqa branch open?»Nadine Reviews
Latest 6 of 48
Comment mood
Nice 👍
Do you have almond milk instead of oat?
When exactly does the Al-Malqa branch open?
How much is a kilo of the Ethiopian beans?
The Hittin seating is honestly the best place to study
Tagging @lama_n — we have to go this weekend