
Today’s pour from our Olaya barista ☕ Can you guess the shape?
Posted 23 October 2026 at 2 pm · 26d ago
72% of the reach came from outside your followers.
Brought 368 new followers — 13.8 per 1,000 reached (usually 6.4).
Reach
26,678
usually 8,893
Impressions
50,344
Engagement rate
7.5%
usually 5.4%
New followers
368
13.8 per 1,000 reached
Likes
1,504
Comments
195
Shares
169
Saves
128
Cumulative reach hour by hour, against your typical Instagram post
Average watch 11s of 19s — 58% of the video
72% of the reach came from outside your followers.
Brought 368 new followers — 13.8 per 1,000 reached (usually 6.4).
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 3× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 9 pm; at the peak it would have started stronger.
The comments back this up: 3 of 6 are positive, and 3 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 9 pm, at your audience’s peak.
Evidence
«Tried it today — balanced and not too sweet 👌»Sultan Al-Enezi
«Do you have almond milk instead of oat?»Shahad Al-Omari
Latest 6 of 195
Comment mood
Tried it today — balanced and not too sweet 👌
Do you have almond milk instead of oat?
When exactly does the Al-Malqa branch open?
How much is a kilo of the Ethiopian beans?
That pour is stunning 😍 who’s the barista?
Best cheesecake I’ve had this month, worth every riyal