
Step by step: our V60 with Ethiopian Yirgacheffe
Posted 25 October 2026 at 2 pm · 24d ago
70% of the reach came from outside your followers.
Brought 281 new followers — 16.4 per 1,000 reached (usually 6.4).
Reach
17,124
usually 8,562
Impressions
30,666
Engagement rate
7.7%
usually 5.4%
New followers
281
16.4 per 1,000 reached
Likes
947
Comments
125
Shares
141
Saves
102
Cumulative reach hour by hour, against your typical Instagram post
Average watch 19s of 33s — 58% of the video
70% of the reach came from outside your followers.
Brought 281 new followers — 16.4 per 1,000 reached (usually 6.4).
It worked because it came as a Reel — the format your Instagram audience engages with most — so it beat your usual 2× and most of it reached people who don’t follow you yet.
It went out at 2 pm while your audience peaks at 10 pm; at the peak it would have started stronger.
The comments back this up: 3 of 6 are positive, and 1 ask about the details — a sign of real interest.
Next step: repeat the idea and post it at 10 pm, at your audience’s peak.
Evidence
«When exactly does the Al-Malqa branch open?»Rakan Al-Mutairi
«The Hittin seating is honestly the best place to study»Hisham Al-Sahafi
Latest 6 of 125
Comment mood
When exactly does the Al-Malqa branch open?
The Hittin seating is honestly the best place to study
That pour is stunning 😍 who’s the barista?
Tagging @lama_n — we have to go this weekend
Prices have crept up compared with last year
Tried it today — balanced and not too sweet 👌